Repositorycollectionsoperations-2026-10

Collection · documents

Current operations and Colab tier audits

Current handoff, canonical export-sync workflow and post-run tier marks. Eligibility is not completed pixel vetting or a discovery claim.

Published Operational audit; scientific review outstanding

The October 2 export contains 99 saved checkpoints out of 100 requested targets: 68 earned T0, one T1 and 30 T2, with one missing. All ran at T0. The input audit verifies 101 of 2,573 manifest files; bulk products remain unreviewed. The smoke export has three T2-eligible targets. Companion Colab ledgers remain separate from the workstation ledger.

Contents 4 items

Current project status

Download available Project-authored document

Maintained
not recorded
Size
7.0 KB
Public copy
Private storage locations replaced with placeholders
License
Apache-2.0

Read online →

Files

  • STATUS.md Markdown source (public copy) · 7.0 KB · sha256 a9381cf95d5d… Download STATUS.md

Colab output sync and scheduler ownership

Download available Project-authored document

Maintained
not recorded
Size
6.3 KB
Public copy
Unmodified
License
Apache-2.0

Read online →

Files

October 2 export: post-run tier marks

Download available Project-authored document

Maintained
not recorded
Size
15.7 KB
Public copy
Unmodified
License
Apache-2.0

Read online →

Files

  • TIER_MARKS.md Markdown source (public copy) · 15.7 KB · sha256 250e6a2c6506… Download TIER_MARKS.md

Smoke export: post-run tier marks

Download available Project-authored document

Maintained
not recorded
Size
1.4 KB
Public copy
Unmodified
License
Apache-2.0

Read online →

Files